Redevelopment of the Infectious Disease Clinic
CIUSSS West-Central Montreal
Jewish General Hospital
The Jewish General Hospital (JGH) plans to relocate and build the Infectious Diseases Department in early 2020. The new clinic will be built on the 2nd floor of Pavilion G, which has the electromechanical infrastructure required for this type of function. The program includes fifteen examination rooms, two treatment clinics for OPAT/ID patients and an administrative section for doctors and nurses, all spread over a 5,000 sq. ft. area.
We fully understood the customer’s issues, establishing an adapted program for access control and patient safety. Precise work and regular meetings with users ensured optimal design to meet the needs of the clinical group. As part of this mandate, we carried out the following tasks:
- Detailed surveys and CAD drawings of existing installations.
- Design and upgrade of mechanical installations in Plumbing and Medical Gas, HVAC, Fire Protection and Electrical according to current codes and standards to ensure compliance with the highest requirements.
- Preparation of plans and specifications for construction, ensuring tailor-made solutions adapted to the specific needs of the project.
- Services during construction, including participation in site meetings, verification of shop drawings, recommendations for payment requests, technical support for contractors, visits and deficiency reports, and acceptance of work.
A detailed supervision plan and schedule facilitated smooth coordination. Despite the asbestos conditions, we delivered the project on time and on budget. At Enertech Solutions, our expertise and collaborative approach are the key to our success. We’re ready to meet your engineering challenges with excellence.